Posted inAgile Project Management Agile Software Development Posted by admin August 19, 2021 In the 1990s, as the large software firms were “maturing” along the CMM dimension, and…
Posted inAgile Project Management The Software Capability Maturity Model (SW-CMM) Posted by admin August 19, 2021 To deal with the “software crisis” in the 1980s, the US Air Force prompted the…
Posted inAgile Project Management Waterfall and Big Design Up Front (BDUF) Posted by admin August 19, 2021 The origins of the so-called “Waterfall” approach can be traced back to Winston Royce, a…
Posted inAgile Project Management Adopting Agile Practices in Large-Scale Software Engineering Posted by admin August 19, 2021 Some of the “low hanging fruit”, what I will call “primitive agile genes”, are ones…
Posted inAgile Project Management Interpretation of results Posted by admin August 19, 2021 With six Agile gene related switches (note, that we get Feature-driven plus Interactive-incremental automatically when…
Posted inAgile Project Management Case 5: Introducing Customer Involvement Posted by admin August 19, 2021 We now introduce the Customer Involvement gene, which means that there will be some requirements…
Posted inAgile Project Management Case 3: Introduction of Refactoring Posted by admin August 19, 2021 In this case we will allow refactoring. As described earlier (5.2.3) this means that when…
Posted inAgile Project Management Case 1 ; Fixed-schedule Feature-Driven Iterative/Incremental Posted by admin August 19, 2021 In the next experiment, we ‘turn off’ the waterfall switch. This activates the iterative/incremental gene…
Posted inAgile Project Management Earned Value Management Posted by admin August 19, 2021 Earned Value Management (EVM) is a management methodology for monitoring and controlling schedule, cost, and…
Posted inAgile Project Management Base Case Experiment (single-pass waterfall) Posted by admin August 19, 2021 As a base-case, we start by executing the model in “waterfall mode” by using our…